. : Project Cicero’s : .

Scope of Project

  • > Enhance overall aesthetics and function of the interior space
    > Overall theme is to be modern + clean + warm + timeless

  • 1) Existing tiled counter to become a 42” wall with screen above (ie. glass)
    2) Add return counter for ordering & incorporate beverage refrigerator
    3) TVs on back wall for menus & vertical TV for specials & catering
    4) Paint existing ceiling tiles & back half of store

    5) Self serve soda machine (@corner of 42” wall) including syrup storage & Co2 tanks

    6) 2 Kegerators

    7) 2 New booths

    8) Remove interior awning

    9) New Lighting

    10) Polished concrete floor

    11) Left wall (mural wall) to be painted : Add CICERO’S sign & paneling to 34”

    12) Front right corner : wall treatment & built-in TV | “L” shaped bar seating | 2 person table

    13) Remove ceiling fans

    14) New glass door (entry)

    15) Relocate toppings station

  • - Design Set
    > Interior Design : design & technical details | 2D plan | 3D model | photo realistic renderings
    > Specifications : materials, finishes, fixtures, components, lighting (functional & accent)
    - Value Design
    > Overall design, design details, materials & associated costs to be considered
    - Professional Assistance & Advice
    > finishes & components selections (digital and/or @showrooms)
    > effective over-site that designs & plans are being followed during construction


Phase : Design Development

Completed - 9/22/2023

We implement any requested changes and further develop the designs and design details.

Below is the last iteration of the design made per the client’s request. (9/22/2023)